Dock High. Overhead sprinkler system. 10' x 10' overhead doors. Construction is metal with concrete block end walls. 5" reinforced concrete floors. 24' eave height. City water and electric. Three phase electric available.
Fast access to Highways 98, 92, the Polk Parkway and Interstate 4. Approximately one mile from full interchange. Interstate links east and west coasts and connects with north-south highways of Interstate 75 and U.S. Hwy 27.
Multi-Tenant
B
Existing
1991
1
13,500 SqFt
9,000 to 13,500 SqFt
36,000 SqFt
2.09 Acres
2/1000SqFt
24.0 Ft
Tampa/St. Petersburg
Polk County
232820089000003031
24’ Eave height
Covered loading dock with ramp
Covered walkway
9,000 sf minimum
10′ x 10′ overhead doors
10′ ridge vent each bay
Continuous translucent wall panels
Overhead sprinkler system
Ample parking, including trucks
Three-phase electrical services available, and 277/480V, 120/240V, 120/208V